[1]
D. De León, S. Díaz Camacho, and C. A. González Pérez, “Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration.”, REV TEC FAC ING UNIV, vol. 36, no. 2, 1.