De León, D., Díaz Camacho, S., & González Pérez, C. A. (1). Reliability-based optimal next inspection time of prestressed concrete bridges including the effect of corrosion deterioration. Rev. Téc. Fac. Ing. Univ. Zulia, 36(2). Recuperado a partir de https://produccioncientifica.luz.edu.ve/index.php/tecnica/article/view/6900